Woldgate College, York - Service 2 (HVAC) Limited

Woldgate College, York

Lauren Presland Project

Service 2 have been appointed as the M&E contractor to carry out the heating upgrade at Woldgate college, Pocklington, York.

The works include decentralising the existing oil fired LTHW system and installing 4 new localised gas fired plant rooms to remove the issues caused by underground heating pipework that has failed on numerous occasions.

Working with Hamworthy, we will be installing Stratton MK2 room sealed boilers and a BMS system to control the site.

Service 2 will be delivering the full mechanical and electrical elements for the project, including the installation of natural gas to site and the distribution of new HDPE underground gas pipework to each new plant room location.

* UPDATE 11.04.18 *

With the half term over, 3 of 4 plant rooms are now operational.

The 4th plant room was delayed due to ACM being stripped, so temporary boilers have been purpose made and installed to ensure the school suffers no disruption until the new permanent boilers have been installed. We chose 3x Ideal Evomax 150’s and a plate heat exchanger to protect them.

Keep an eye out on our website and social media accounts for more information as this project draws reaches completion.

  • Hamworthy boiler HVAC installation - Service 2 (HVAC) Limited - Mechanical Engineers
  • Hamworthy HVAC installation - Service 2 (HVAC) Limited Mechanical Engineering
  • Hamworthy HVAC installation - Service 2 (HVAC) Limited
  • Hamworthy boiler HVAC installation - Service 2 (HVAC) Limited
  • Service 2 custom made temporary boiler housing
  • Service 2 custom made temporary boiler system
  • Service 2 custom made temporary boilers
  • Service 2 custom made temporary boiler
  • Service 2 custom made temporary boiler installations
  • Service 2 custom made temporary boiler piping
  • Service 2 custom made temporary boiler unit