Brainkind Daniel Yorath House

Brainkind Daniel Yorath House: Comprehensive Water System Modernisation

Project Overview

Service 2 successfully completed a complex domestic hot and cold water system upgrade at Daniel Yorath House, a specialist rehabilitation facility operated by Brainkind. This comprehensive project transformed the building’s water infrastructure, addressing multiple systemic issues while significantly improving reliability, pressure consistency, and water quality for residents and staff.

Challenge

The rehabilitation facility faced several critical water system challenges:

                Inadequate water pressure throughout the building affecting care delivery

                Reliance on 24 individual point-of-use booster pumps creating maintenance burden

                Inconsistent hot water delivery impacting resident comfort and care routines

                Outdated storage tank configuration with potential compliance concerns

                Need to maintain continuous water services to a vulnerable resident population

                Requirement for minimal disruption to rehabilitation activities and care provision

Solution

Our team designed and implemented a comprehensive water system transformation:

                Installed a twin-pump packaged cold water booster set to provide consistent pressure throughout the facility

                Completed all associated electrical power and control wiring to new booster system

                Undertook necessary builders’ work to accommodate new equipment and pipework routes

                Installed an unvented kit to the existing gas-fired water heater with optimised storage connection arrangement

                Reconfigured cold water storage tanks and associated hot, tank cold and mains cold water systems

                Applied professional-grade insulation to all pipework to improve efficiency and prevent heat loss

                Removed 24 Salamander Pumps Ltd ‘Boost’ mini point-of-use pumps and installed infill pipework

                Re-balanced the existing domestic hot water return system to ensure consistent temperature

                Conducted comprehensive sterilisation/chlorination of all water systems to ensure potable water quality

Results

The modernised water system has delivered significant benefits to Daniel Yorath House:

                Consistent water pressure throughout the facility without reliance on multiple point-of-use pumps

                Enhanced reliability with simplified maintenance requirements

                Improved hot water delivery supporting resident care and comfort

                Optimised energy efficiency through better system design and insulation

                Full compliance with water quality and safety regulations

                Reduced operational costs through elimination of multiple pump maintenance

                Improved system resilience with professional-grade equipment

This project exemplifies our expertise in complex water system upgrades within sensitive healthcare environments, particularly our ability to maintain essential services while implementing comprehensive infrastructure improvements.