Trinity Shopping Centre Leeds

Trinity Shopping Centre, Leeds: Bespoke Calorifier Replacement

Project Overview

Service 2 successfully completed a specialised calorifier replacement project at Trinity Shopping Centre in Leeds, one of the region’s premier retail destinations. This precision engineering solution addressed a potentially critical hot water system failure while overcoming significant space constraints in this busy commercial environment.

Challenge

The shopping centre faced several complex challenges:

                Active water leak from the existing calorifier threatening operational continuity

                Extremely limited plant room access and spatial constraints

                Need to maintain hot water services to public and retail facilities

                Requirement for minimal disruption to shopping centre operations

                High-profile commercial environment with strict operational standards

                Time-sensitive replacement to prevent water damage and service interruption

Solution

Our team designed and implemented a tailored solution to address these unique circumstances:

                Conducted comprehensive site assessment to precisely measure available space and access routes

                Designed a custom-manufactured calorifier vessel specifically engineered for the restricted location

                Developed a detailed installation methodology to navigate complex access limitations

                Coordinated with shopping centre management to schedule works during minimal-impact periods

                Safely removed the damaged calorifier through restricted access points

                Installed and commissioned the bespoke replacement vessel with all associated connections

Results

The bespoke engineering solution delivered significant benefits to Trinity Shopping Centre:

                Eliminated water leakage risk, protecting valuable retail infrastructure

                Restored reliable hot water services throughout the facility

                Optimised use of limited plant room space with custom-designed equipment

                Minimised disruption to shopping centre operations during the replacement process

                Extended system lifespan with high-quality, purpose-built equipment

This project showcases our expertise in developing bespoke engineering solutions for challenging commercial environments, particularly where standard equipment options are unsuitable due to space or access limitations.