City Walk, Leeds

Service 2 engineers were recently called to attend City Walk, Leeds in order to investigate some issues they were experiencing with their current system.

Following a site visit, our engineers found that the current booster set had failed and the pumps had seized. The mains water was being supplied to a break tank and the water pressure in that area was very low. Service 2 engineers were quickly able to determine that a new booster set was required in order to help meet the demands of the building.

Once our proposed work was approved, our team re-attended site in order to carry out the system upgrade with the installation of a new booster set. Initially, the system was temporarily wired up by our mechanical team as per the pictures. Our electrical engineers attended the following day in order to carry out a 3-phase to single phase conversion, carry out fixed wiring to the new system and certify in accordance with NICEIC regulations.

Work was completed to the highest standards and in full compliance with all relevant regulations as well as onsite policies and procedures.

If you’d like to speak to us about any of our mechanical engineering services, simply contact our service team on 01535 601400.

City Walk Leeds 2


Stockport Header - Service 2 HVAC

Production Facility, Stockport

A team of Service 2 engineers were recently called to a large production facility in Stockport. After a detailed site inspection, we installed 2 x Reznor warm air heaters and associated controls.

As always, our team worked hard and in compliance with all relevant rules and regulations to ensure that work was completed to an exceptionally high standard, on time and in budget.

If you’d like to speak to us about any of our mechanical engineering services, simply contact our service team on 01535 601400.
SPIE - Stockport - Service 2 HVAC LimitedSPIE - Service 2 HVACSPIE Stockport - Service 2Service 2 - SPIE


Old School Rooms, Addingham

The Service 2 team have recently completed the M&E refurbishment works for our valued client RN Wooler at The Old School Rooms, Addingham.

Our works included the full strip out of all services, and the installation of a new heating system with efficient boiler, new small power and data throughout and new lighting.

If you’d like to speak to us about any of our mechanical engineering services, simply contact our service team on 01535 601400.
The Old Tea Rooms - Service 2 HVACThe Old Tea Rooms Addingham - Service 2 HVACThe Old Tea Rooms - Service 2 HVAC - Keighley


St Johns Church - Service 2 Completed Project

St Johns Church, Chesterfield

Following a detailed site survey, Service 2 were commissioned to replace an existing, inefficient boiler with a brand new Hamworthy model alongside a new flue system.

This new heating solution is fully compliant with current gas safe regulations and it is significantly more efficient than the old, outdated system.

Work progressed really well our team of skilled mechanical engineers worked diligently to complete this project on schedule.
St Johns Church - Hamworthy Boiler Completed install Service 2 HVAC Limited


Club Towers One Health Club, Bedford

Our team recently completed works on Club Towers One Health Club in Bedford as detailed below.

Service 2 engineers were initially called to attend Club Towers One, Bedford due to their boiler not functioning correctly.

Once we arrived on site, our team of engineers were able to work quick and efficiently to diagnose the issue and carry out the necessary work in order to get the boiler back up and running.

Our experienced engineers replaced the flue due to boiler not functioning and signs of combustion gasses mixing with air intake/combustion air. Additionally our team stripped and inspected the fan, heat exchanger and condense line in order to ensure of no blockages/debris potentially interrupting the combustion process.

After thorough testing we re-commissioned alliance on completion and left everything in full working order. As always, work was completed to the very highest standards.
Service 2 HVAC EngineersService 2 HVAC EngineersService 2 HVAC EngineersService 2 HVAC EngineersService 2 HVAC Engineers


Service 2 - St Bernards News Banner

St Bernard’s School, Rotherham

Our summer project at St Bernard’s, Rotherham is now complete. We partnered with Eddisons to deliver a ventilation and gas safety system to the science block, bringing it up to standards.

The installation saw us install a modulating supply and extract system, complete with LTHW boiler/coil and a recuperator to ensure efficiency was at the highest possible rates.

The gas safety side incorporated gas interlock systems to each class room, inclusive of new gas taps throughout, all linked back to the new BMS system which was bespoke for the project.

All new ceilings and lighting were also installed giving the science block a new feel throughout.


Service 2 HVAC - Badby Primary School - News Banner

Badby Primary School, Daventry

This summer school project involved the installation of a new heating system throughout, with a new plant room and BMS bringing superior levels of efficiency. We also installed AC and created a dead band in each classroom to comfort cool the space.

The project was completed within budget and ahead of schedule thanks to the onsite teams hard work and diligence.Service 2 - Plant RoomService 2 HVAC - Badby SchoolService 2 HVAC - Badby School


Heaton Tennis & Squash Club, Bradford

Whilst carrying out PPM’s on site, our engineer found the external gas pipe which fed a warm air heater was corroded and leaking, which was isolated and capped. Further investigation found that the existing gas supply was undersized.

Service 2 designed a new gas supply that would be adequate for for use at the Tennis club which consisted of a new underground 125mm HDPE gas supply being laid in a purpose excavated trench.

Service 2 also removed a legionella risk from site by replacing the 300L direct fired gravity fed gas water heater, and replacing it with 2x 300L indirect mains fed pressurised cylinders and a Keaton H45 boiler.


Grassmoor Community Centre, Chesterfield

Following a detailed site survey, Service 2 were commissioned to install to 2 x Hamworthy Stratton MK2 S2-60 KW boilers alongside a new stainless steel twin wall flue system. This new heating system was designed in house by Service 2 to replace the existing uneconomical and unreliable system. Our bespoke solution is fully compliant with current gas safe regulations and significantly more efficient than the old, outgoing system.

We're pleased to announce that this project has been completed on schedule and to the very highest standards.Grassmoor Community Centre Hamworthy heating installation - Service 2 (HVAC) LimitedGrassmoor Hamworthy heating installation - Service 2 (HVAC) LimitedService 2 (HVAC) Limited- Stainless steel twin flue system


Audley Retirement Village, Ilkley

Service 2 visited Audley Retirement Village in Ilkley as they were looking for options to upgrade their existing heating system. Following on from our extensive site survey, a detailed report was issued. This report recommended replacing the existing three existing Remeha boilers with two, more efficient 120KW Hamworthy Stratton mk2 condensing boilers. These proposed works would provide a much more efficient heating system across the site.

Work was completed on budget and on schedule. Our extremely experienced team of mechanical engineers worked hard to complete this project to the very highest standards.

Following the installation we have been the main contractor for all HVAC reactive works and maintenance.