Arriva Derby

Arriva Derby Headquarters: HVAC System Modernisation

Project Overview

Service 2 successfully completed a comprehensive air conditioning system replacement at Arriva Derby’s headquarters, upgrading outdated units across both ground and first floor office spaces. This strategic modernisation has significantly improved energy efficiency, occupant comfort, and system reliability.

Challenge

The existing air conditioning infrastructure had reached the end of its operational lifespan, resulting in:

                Declining performance and inconsistent temperature control

                Increasing maintenance requirements and operational costs

                Poor energy efficiency compared to modern alternatives

                Potential reliability issues affecting workplace productivity

Solution

Our team designed and implemented a tailored HVAC solution that addressed Arriva’s specific requirements while minimising disruption to their daily operations:

                Conducted thorough site assessment and load calculations to determine optimal system specifications

                Removed and responsibly disposed of outdated equipment in accordance with environmental regulations

                Installed state-of-the-art, energy-efficient air conditioning units throughout both floors

                Optimised system configuration for balanced airflow and consistent temperature control

                Integrated with existing building management systems for enhanced control capabilities

                Completed comprehensive testing and commissioning to ensure peak performance

Results

The newly installed system has delivered substantial benefits to Arriva Derby:

                Enhanced workplace comfort with precise temperature control

                Reduced energy consumption and associated operational costs

                Improved environmental credentials through lower carbon emissions

                Decreased maintenance requirements and extended system lifespan

                Future-proofed cooling infrastructure with modern technology

This project demonstrates our expertise in commercial HVAC modernisation, delivering tangible improvements to workplace environments while supporting our clients’ operational and sustainability objectives.


Trinity Shopping Centre Leeds

Trinity Shopping Centre, Leeds: Bespoke Calorifier Replacement

Project Overview

Service 2 successfully completed a specialised calorifier replacement project at Trinity Shopping Centre in Leeds, one of the region’s premier retail destinations. This precision engineering solution addressed a potentially critical hot water system failure while overcoming significant space constraints in this busy commercial environment.

Challenge

The shopping centre faced several complex challenges:

                Active water leak from the existing calorifier threatening operational continuity

                Extremely limited plant room access and spatial constraints

                Need to maintain hot water services to public and retail facilities

                Requirement for minimal disruption to shopping centre operations

                High-profile commercial environment with strict operational standards

                Time-sensitive replacement to prevent water damage and service interruption

Solution

Our team designed and implemented a tailored solution to address these unique circumstances:

                Conducted comprehensive site assessment to precisely measure available space and access routes

                Designed a custom-manufactured calorifier vessel specifically engineered for the restricted location

                Developed a detailed installation methodology to navigate complex access limitations

                Coordinated with shopping centre management to schedule works during minimal-impact periods

                Safely removed the damaged calorifier through restricted access points

                Installed and commissioned the bespoke replacement vessel with all associated connections

Results

The bespoke engineering solution delivered significant benefits to Trinity Shopping Centre:

                Eliminated water leakage risk, protecting valuable retail infrastructure

                Restored reliable hot water services throughout the facility

                Optimised use of limited plant room space with custom-designed equipment

                Minimised disruption to shopping centre operations during the replacement process

                Extended system lifespan with high-quality, purpose-built equipment

This project showcases our expertise in developing bespoke engineering solutions for challenging commercial environments, particularly where standard equipment options are unsuitable due to space or access limitations.


Bradford Girls Grammar School

Bradford Girls’ Grammar School: Sports Hall Heating System Replacement

Project Overview

Service 2 successfully completed a comprehensive heating system upgrade for Bradford Girls’ Grammar School’s sports hall facilities. This project involved replacing an outdated boiler system with modern, high-efficiency equipment to enhance reliability, improve energy performance, and ensure consistent heating for this critical educational space.

Challenge

The existing sports hall heating infrastructure presented several challenges:

                Ageing boiler system with declining efficiency and reliability

                Inadequate hot water provision for changing facilities

                Increasing maintenance costs and frequent repairs

                Energy consumption concerns impacting the school’s operational budget

                Need to maintain comfortable conditions for physical education activities

Solution

Our team designed and implemented a bespoke heating solution tailored to the specific requirements of an educational sports facility:

                Removed the existing outdated boiler system and associated pipework

                Installed two Ideal Evomax natural gas wall-mounted boilers

                Integrated two ACV hot water cylinders to provide reliable and abundant hot water

                Upgraded associated plant equipment including pumps, valves and controls

                Implemented new pipework configurations to optimise system performance

                Completed the project during a scheduled school holiday period to minimise disruption

Results

The modernised heating system has delivered significant benefits to Bradford Girls’ Grammar School:

                Enhanced reliability ensuring consistent heating for sports activities throughout the year

                Improved hot water capacity and delivery for changing room facilities

                Reduced energy consumption through higher-efficiency equipment

                Decreased maintenance requirements and operational costs

                Extended system lifespan with modern, serviceable equipment

This project demonstrates our expertise in educational facility heating systems, particularly our ability to deliver complex installations within tight timeframes while meeting the specific requirements of school environments.


Brainkind Daniel Yorath House

Brainkind Daniel Yorath House: Comprehensive Water System Modernisation

Project Overview

Service 2 successfully completed a complex domestic hot and cold water system upgrade at Daniel Yorath House, a specialist rehabilitation facility operated by Brainkind. This comprehensive project transformed the building’s water infrastructure, addressing multiple systemic issues while significantly improving reliability, pressure consistency, and water quality for residents and staff.

Challenge

The rehabilitation facility faced several critical water system challenges:

                Inadequate water pressure throughout the building affecting care delivery

                Reliance on 24 individual point-of-use booster pumps creating maintenance burden

                Inconsistent hot water delivery impacting resident comfort and care routines

                Outdated storage tank configuration with potential compliance concerns

                Need to maintain continuous water services to a vulnerable resident population

                Requirement for minimal disruption to rehabilitation activities and care provision

Solution

Our team designed and implemented a comprehensive water system transformation:

                Installed a twin-pump packaged cold water booster set to provide consistent pressure throughout the facility

                Completed all associated electrical power and control wiring to new booster system

                Undertook necessary builders’ work to accommodate new equipment and pipework routes

                Installed an unvented kit to the existing gas-fired water heater with optimised storage connection arrangement

                Reconfigured cold water storage tanks and associated hot, tank cold and mains cold water systems

                Applied professional-grade insulation to all pipework to improve efficiency and prevent heat loss

                Removed 24 Salamander Pumps Ltd ‘Boost’ mini point-of-use pumps and installed infill pipework

                Re-balanced the existing domestic hot water return system to ensure consistent temperature

                Conducted comprehensive sterilisation/chlorination of all water systems to ensure potable water quality

Results

The modernised water system has delivered significant benefits to Daniel Yorath House:

                Consistent water pressure throughout the facility without reliance on multiple point-of-use pumps

                Enhanced reliability with simplified maintenance requirements

                Improved hot water delivery supporting resident care and comfort

                Optimised energy efficiency through better system design and insulation

                Full compliance with water quality and safety regulations

                Reduced operational costs through elimination of multiple pump maintenance

                Improved system resilience with professional-grade equipment

This project exemplifies our expertise in complex water system upgrades within sensitive healthcare environments, particularly our ability to maintain essential services while implementing comprehensive infrastructure improvements.


Bluewater Shopping Centre

Bluewater Shopping Centre: Air Handling Unit Modernisation

Project Overview

Service 2 successfully completed a sophisticated HVAC system upgrade at Bluewater Shopping Centre, one of the UK’s premier retail destinations. This project involved converting existing air handling units to modern DX (direct expansion) technology, enhancing energy efficiency and operational reliability while maintaining optimal climate conditions for this high-footfall retail environment.

Challenge

The shopping centre faced several technical challenges with their existing HVAC infrastructure:

                Outdated gas-powered air handling system with increasing maintenance requirements

                Need to transition to more efficient and environmentally friendly cooling technology

                Complex rooftop installation requirements in an active retail environment

                Strict operational constraints to maintain shopping centre climate control during works

                Limited access windows to minimise disruption to retailers and shoppers

                Requirement for safe decommissioning of existing gas and refrigeration systems

Solution

Our team implemented a comprehensive solution to modernise the air handling units:

                Conducted detailed site surveys and developed a phased implementation strategy

                Safely decommissioned and removed existing gas connections to air handling units

                Professionally degassed and removed outdated refrigeration pipework in accordance with F-Gas regulations

                Installed new Daikin DX cooling coils on the rooftop location with specialist lifting equipment

                Implemented new DX pipework systems connecting to external condensers

                Conducted pressure testing and leak detection on all new refrigeration circuits

                Completed full system commissioning and operational testing to manufacturer specifications

                Provided detailed handover documentation and operational training

Results

The modernised HVAC system has delivered significant benefits to Bluewater Shopping Centre:

                Enhanced energy efficiency with state-of-the-art Daikin DX technology

                Improved climate control performance throughout connected retail areas

                Lower operational costs through more efficient cooling technology

                Simplified maintenance requirements with modern, serviceable equipment

                Extended system lifespan with current-generation components

                Full compliance with current refrigerant regulations and environmental standards

This project showcases our expertise in complex commercial HVAC upgrades, particularly our ability to manage challenging rooftop installations and system transitions in high-profile retail environments with zero tolerance for service interruption.


St Johns C Of E School Darlington

St John’s C of E School, Darlington: Solar PV System Installation

Project Overview

Service 2 successfully completed a comprehensive solar photovoltaic (PV) installation at St John’s Church of England School in Darlington. This renewable energy project has transformed the school’s energy profile, reducing operational costs while creating valuable educational opportunities around sustainability and clean energy generation.

Challenge

The school faced several energy-related challenges:

                Rising electricity costs placing increasing pressure on limited educational budgets

                Ambition to reduce carbon footprint in line with Church of England environmental commitments

                Need to demonstrate environmental leadership to pupils and the wider community

                Requirement for installation with minimal disruption to educational activities

                Need for system longevity and reliability to maximise return on investment

Solution

Our team designed and implemented a tailored solar PV solution:

                Conducted comprehensive site assessment including structural surveys and shading analysis

                Designed an optimised solar array configuration to maximise energy generation

                Installed high-efficiency solar panels with enhanced durability for the educational environment

                Implemented inverter technology with monitoring capabilities for educational engagement

                Completed all necessary electrical connections and safety systems

                Coordinated installation during suitable periods to minimise disruption to school activities

                Provided comprehensive system documentation and staff training

Results

The solar PV installation has delivered significant benefits to St John’s C of E School:

                Substantial reduction in electricity costs, freeing budget for educational priorities

                Creation of a valuable educational resource for science and sustainability curriculum

                Enhanced reputation as an environmentally responsible educational institution

                Protection against future energy price increases through on-site generation

                Potential revenue through export of excess electricity to the grid

                Expected system lifespan of 25+ years providing long-term financial and environmental benefits

This project demonstrates our expertise in educational renewable energy installations, particularly our ability to deliver systems that combine financial benefits with educational value, supporting schools in both their operational efficiency and their teaching of environmental responsibility.


Crowne Plaza Hotel Sheffield

Crowne Plaza Hotel, Sheffield: Emergency BMS Control Panel Replacement

Project Overview

Service 2 successfully executed an urgent Building Management System (BMS) control panel replacement at the Crowne Plaza Hotel in Sheffield following a catastrophic failure. This critical emergency response project restored essential gas services to the hotel, minimising operational disruption and ensuring guest comfort and safety.

Challenge

The hotel faced a severe crisis situation:

                Complete loss of gas supply following a fire in the original BMS control panel

                Disruption to heating, hot water, and kitchen operations affecting guest services

                Potential revenue loss and reputational damage from extended service interruption

                Need for rapid response while ensuring compliance with all safety regulations

                Requirement to integrate with existing hotel systems and infrastructure

Solution

Our emergency response team mobilised immediately to implement a comprehensive solution:

                Conducted thorough damage assessment and safety checks of the affected systems

                Designed a replacement BMS control solution compatible with existing hotel infrastructure

                Sourced and expedited delivery of a new control panel and associated components

                Installed and commissioned the replacement BMS system under emergency conditions

                Implemented enhanced safety features to prevent similar incidents in future

                Restored gas supply to all critical hotel systems including heating, hot water and kitchens

                Provided comprehensive system documentation and staff training

Results

Our rapid response and technical expertise delivered significant outcomes for the Crowne Plaza Hotel:

                Minimised downtime of essential hotel services during a critical situation

                Restored full operational capability to heating, hot water and catering facilities

                Enhanced system reliability with modern control technology

                Improved safety features and monitoring capabilities

                Reduced risk of future system failures through upgraded components

                Provided peace of mind with comprehensive system documentation and support

This project demonstrates our emergency response capabilities and technical expertise in complex BMS systems, particularly in high-stakes commercial environments where business continuity is paramount.


Airy Hill Primary School

Airy Hill Primary School: Hybrid Heating System Installation & Plant Room Modernisation

Project Overview

Service 2 successfully completed a comprehensive heating system transformation at Airy Hill Primary School, implementing an innovative hybrid solution combining traditional gas boilers with renewable heat pump technology. This forward-thinking project delivered a complete plant room overhaul, significantly enhancing energy efficiency while ensuring reliable heating for the educational environment.

Challenge

The primary school faced several critical heating infrastructure challenges:

                Ageing and inefficient heating system struggling to maintain comfortable learning environments

                Rising energy costs impacting the school’s operational budget

                Requirement for system resilience to ensure consistent heating throughout the academic year

                Limited disruption window during school holiday periods

                Need for a future-proofed solution

Solution

Our team designed and implemented a comprehensive hybrid heating solution:

                Installed two high-efficiency Vaillant ecoTEC gas boilers to provide reliable base heating capacity

                Integrated four Vaillant aroTHERM Plus air source heat pumps to deliver renewable heating

                Completed full plant room reconstruction including new pipework, pumps and headers

                Implemented advanced control systems to optimise the hybrid operation between heat pumps and boilers

                Installed new heat emitters where required to maximise heat pump efficiency

                Implemented comprehensive system monitoring for performance optimisation

                Completed the installation during school holiday period to minimise educational disruption

Results

The modernised heating system has delivered transformative benefits to Airy Hill Primary School:

                Significantly reduced carbon emissions through renewable heat pump technology

                Lower energy costs through more efficient equipment and intelligent hybrid operation

                Enhanced heating reliability with redundancy built into the system design

                Improved temperature control creating better learning environments

                Reduced maintenance requirements with modern, serviceable equipment

                Valuable educational resource demonstrating renewable technology to pupils

This project exemplifies our expertise in educational facility heating modernisation, particularly our ability to implement innovative hybrid solutions that combine traditional and renewable technologies to deliver both immediate performance improvements and long-term sustainability benefits.